Sharjah 24: The emergency teams of the Sharjah Electricity, Water and Gas Authority (SEWA) dealt with 85 reports in the Central Region during the three days, which witnessed heavy rains due to the weather condition in the region.
The teams dealt with and processed the reports at a rate not exceeding 30 minutes, while the residential sector did not witness any malfunctions or power outages.
The reports varied between malfunctions of lighting poles, and power transformer distribution boxes.
Engineer Khalifa Mohammed Al Tunaiji, Director of the Central Region Department, confirmed that the technical teams dealt with the faults in record time, and the power outage did not exceed half an hour.