Dr. Eng. Hassan Al Zarouni, Director of the Electricity Distribution Department, stressed that the expansion of the installation of smart metres brings many advantages and benefits to the SEWA and customers alike.
He pointed out that after making sure that the fees of connection and materials are met, the metre is installed, the cable is extended, and the connection is made to the main point, until a certificate of service connection is obtained from the municipality, following which the electricity service for the project is operated.